Readiness signals
Your starting point
Turn this into an auditHow to use the result
Low readiness
Start with an Observe package: billing exports, usage summaries and lightweight architecture notes.
Medium readiness
Move toward Optimize or Control: add RAG samples, retry events, routing rules and workload categories.
High readiness
Validate a pilot: test direct savings controls while measuring answer integrity and operational risk.